Project background

An automotive logistics center needed to stack bins loaded with stamped parts. Each bin is 1.6 m high; four levels produce a total stack height of 6.4 m, and each bin carries more than 1 t. The project therefore required precise docking under high-load, multi-level operating conditions.

Solution

The project mounted an M4 Pro 3D camera on a smart forklift. The camera estimates the relative pose of the forklift and bin, then provides the offset used to adjust stacking position and angle.
M4 Pro visual positioning for bin stacking

Implementation points

  • Multi-level operation: Stack four bins, each with a height of 1.6 m.
  • Pose-based docking: Calculate the relative forklift-to-bin pose in real time. Project records report a bin-foot recognition error below 5 mm.
  • Exception handling: When the pose offset exceeds the configured range, the system can re-detect, retry docking, or trigger an exception alarm.

Results

The solution supports multi-level bin stacking and reduces manual docking intervention. The on-site result is shown below.
Bin stacking at an automotive logistics center